Earth electrode testing to BS 7430

Every lightning protection system ends in the ground, and the ground is the part you cannot see. Earth electrode testing measures how easily current flows from each rod or ring into the soil, which is what decides whether a strike is spread safely or hangs around on the building.

BS 7430 is the British code of practice for earthing and sets out how electrodes are installed and measured. For lightning protection, the earth readings are taken at each test clamp during the annual test, and the system as a whole is judged against a recommended 10 ohms.

Find a contractor

Code of practice
BS 7430 (earthing)
Lightning earth target
10 ohms or less overall
Tested with
The lightning protection test
Small building test
£200 to £350

When earth testing matters most

  • Your last lightning protection test showed a high or rising earth reading.
  • You are fitting a new system or extra earths and need a commissioning reading.
  • The building has generators, substations, telecoms or sensitive equipment with their own earths.
  • Ground works, drainage or new paving have been done near the earth pits.
  • The site has rocky, sandy or very dry ground where low readings are hard to reach.

What earth testing costs

ItemTypical figure
As part of a lightning protection test
Small building, all earths measured
£200 to £350
As part of a larger site test
School or large commercial building
£450 to £800
Extra rods or a ring to lower a reading
Quoted after the test, depends on ground and access
Quoted
Where these figures come from

Test prices are typical ranges from published UK contractor price guides, autumn 2026, excluding VAT, read October and November 2026. Firms are not named. Contract values are copied from Contracts Finder or Find a Tender notices, ex VAT where stated, and show the size of real jobs rather than a rate for yours.

Plan a test or a new system

How earth electrodes are measured

Fall of potential

The classic method in BS 7430. The electrode under test is disconnected, and two temporary test spikes are driven into the ground in a line some distance away. The tester passes a current between the electrode and the far spike and measures the voltage at points in between. It needs open ground and takes time, but it gives the truest figure for a single electrode.

Dead earth and clamp methods

Where there is no room for spikes, a tester may measure against a known low-resistance earth, or use a clamp-on meter round the conductor without disconnecting it. Both are quicker but need care to read correctly, and the report should say which method was used.

Earth pits

Most rods finish in a small inspection pit with a lid so the connection can be found and tested. Pits get paved over, filled with soil or lost under car parks. Part of a good first test is finding and marking them on the drawing. Our guide to earth pits covers what to look for.

Bringing a reading down

Extend the rod deeper in sections, add more rods spaced well apart and bond them together, or lay a ring conductor round the building. Soil treatments exist but are a last resort; the design should explain why they are needed.

What the earth readings on your report should show

A single overall figure is not enough to manage an earth system. Look for these.

  • One reading per electrode

    Measured with its test clamp open, so a dead rod cannot hide behind a good one.

  • The method used

    Fall of potential, dead earth or clamp, so next year can be measured the same way.

  • Ground conditions

    Dry, wet or frozen on the day, because soil moisture changes readings a lot.

  • Last year alongside

    So a slow drift upwards gets caught before it becomes a fail.

How earth testing and improvement runs

  1. Find the pits

    Locate every test point and earth pit from the drawing, or trace them if there is no drawing.

  2. Measure

    Each electrode on its own, then the system overall, by the method the site allows.

  3. Diagnose

    Compare with past readings and ground conditions to separate a seasonal rise from a real fault.

  4. Improve and retest

    Remake connections, extend or add rods, then measure again and record the new figures.

Questions people ask

What is BS 7430?

The British Standard code of practice for protective earthing of electrical installations. It covers how earth electrodes are designed, installed and measured, and lightning protection testers use its methods for the earth readings in a BS EN 62305 test.

What is a good earth resistance reading for lightning protection?

BS EN 62305 recommends 10 ohms or less for the earth termination as a whole. Individual rods may read higher; what matters is the combined figure and whether readings are stable year to year.

Why has my earth reading gone up?

Dry weather, corrosion at the connection, a rod damaged by ground works, or soil that has settled away from the rod. Testing in a different month helps tell weather from a real fault.

How deep do earth rods go?

It depends on the soil. Rods come in sections and are driven until the reading is low enough, which can be a few metres in damp clay or much deeper in sand or rock.

Is earth testing separate from the lightning protection test?

For lightning protection it is normally part of the same visit. Electrical installation earths for the building wiring are tested by electricians as part of the periodic inspection under BS 7671.

Get earth readings looked at

Three quick screens: the postcode of the building, the work, then your contact details. Most people finish in about two minutes.

We are an introduction service, not a lightning protection contractor. We tell you which specialist covers your building before anything is shared, and no one calls you unless you agree.

Step 1 of 3

Where is the building?
Find a contractor